How it works

From first look to signed report.

Six steps, in the order the work happens, and the technology behind each one.

  1. Set up the farm

    Search for the farm and pick its legal parcels, drawn straight from LINZ. Baseplan merges them into a single boundary, and every later check is tied to the exact part of the farm it applies to. Blocks and places are drawn once, on the same map.

  2. Add what happens on the farm

    Record what happens through the year and drop in photos and documents, several at a time. Baseplan unpacks them and files them against the farm, not the job, so the same evidence is ready for every assessment that follows.

  3. Run the assessment

    Baseplan keeps national regulations, regional plans and district plans from across New Zealand in one searchable library, and watches the sources for changes. From the farm's location it pulls the rules that apply, then tests each one against the farm's map, layers such as slope and waterways, the year's activities and your evidence, across the whole farm.

  4. See the findings on the map

    Each risk shows as one clear area on the map, coloured critical, high, medium or low. Each finding is drafted in plain English and carries a trace back to the exact rule and the evidence it used.

  5. Review and decide

    Open a finding and its rule and evidence sit beside it. Accept it, change it or set it aside, and agree an action and a date. Every decision is recorded with who made it and when, so the reasoning behind the report is never lost.

  6. Approve, sign and send

    The report is built from the decisions you recorded, then checked, approved by the farmer and signed. Signing seals it with a unique record number, so any later change would show. Send it to a council contact with access to the farm, or download the pack.

Behind every finding

Four things, always together.

Critical · Waterways

Stock can reach the stream

RuleWaikato Regional Plan 3.11.4.4: stock exclusion from water bodies
Evidence3 photos of stream crossings, 2 Oct 2026
WhereStream margin, western boundary, 3.5 ha
DecisionAccepted. Fence 380 m of the stream margin by March 2027.

Sample finding on a sample farm.

In the signed report

Written for the farmer. Ready for the council.

  • Summary and mapEvery risk and agreed action on one page, and a map of where they are.
  • What was checkedEach topic that was looked at, including those where no risk was found.
  • Approval and sign-offThe farmer's approval, the sign-off and a record of the version.

Ready when you are.

Baseplan is invite-only. Tell us about your work and we'll reply within 48 hours.

Request access